Concrete was pumped 75ft vertically and through a total of 165ft of piping.Lightweight aggregate absorption, 17.6% per test method ASTM C-127.Travel time, roughly 45 minutes and an additional 20 minutes of unloading.The Challenge: Maintain a consistent workability (slump) of the plastic concrete from the production plant to the time of placement. General contractor, Avanti & Level 10, coordinated the construction of the new entertainment center on top of Red Hawk Casino’s 8 th floor parking structure. ft slab, placed on a suspended steel deck. As concrete supplier for this project, Folsom Ready Mix Rancho Cordova, Plant 1 supplied lightweight concrete for the 85,000 sq. The planned entertainment center will occupy 85,000 square feet of space above the northern half of the parking garage and will feature a bowling alley, virtual reality gaming suites, and indoor go-carting. Red Hawk Casino is adding a new hotel and an amusement complex this year in Placerville, CA.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |